Applies to: Laptop plans.
Create a base plan that you can use as a template for other plans. The plans created from base plans are called derived plans.
When a plan is derived from a base plan, changes to the base plan also change the derived plan for options that are inherited. For example, if you change the RPO (recovery point objective) from 4 hours to 10 hours in a base plan, the RPOs for all of the plans inheriting RPO from that base plan are changed to 10 hours.
Procedure
-
Follow the instructions for Creating an Laptop Plan.
-
Remain in the Create plan_type plan dialog box.
-
Under Override restrictions, move the Allow plan to be overridden toggle key to the right.
Moving the Allow plan to be overridden toggle key makes the plan a base plan.
Depending on the plan type, the following options become available: Storage pool, RPO, Backup content, and Retention.
-
For each option, define how the base plan interacts with plans derived from it:
-
Override required: Plans derived from this base plan do not inherit the base plan values and must have its individual values.
-
Override optional: Plans derived from this base plan can either inherit the base plan values or have different values.
-
Override not allowed: Plans derived from this base plan must inherit the base plan values.
Note
You can edit the override options on the existing backup plan. For instructions, see Modifying a Backup Plan.
-
-
Click Save.
Result
On the plan properties page, under Override restrictions, the options and the override settings you chose are listed.