Loading...

Data Views for the Dev-Test Plan Job Statistics: Phase Details Report

This report displays information about each phase in a dev-test job.

To view this report, in the Dev-Test Plan Job Statistics Report, in the Source column, click a VM Name.

Phase Details

This table includes information about each dev-test job phase, including the start time, end time, and duration of the job.

Column

Description

Job ID

Identifier for the dev-test job.

Client

Name of the VM.

Phase

Phase of the dev-test job. For example: Power On and Configure Network Switch.

Status

Status of the VM. Green indicates that the VM is powered on. Red indicates that the VM is powered off.

Start Time

Time that the dev-test job began.

End Time

Time that the dev-test job ended.

Duration (min)

The amount of time it took for the dev-test job to run.

Failure Reason

The reason that the dev-test job failed, if applicable.

Last modified: 9/13/2018 3:05:13 PM