The Job Controller window displays all the current jobs in the CommCell. A status bar at the bottom of the job controller shows the total amount of jobs; the amount of jobs that are running, pending, waiting, queued and suspended; and the high and low watermarks. The watermarks indicate the minimum and maximum number of streams that the Job Manager can use simultaneously.
Caution
If the job stream high watermark value is too high, you might experience a decrease in the CommServe performance.
Procedure
-
From the CommCell Console ribbon, click the Home tab and then click Control Panel.
-
Under the Data section, click Job Management.
-
In the Job Stream High Watermark Level box, type the job stream high watermark level for simultaneous running streams.
Note
The Job Manager can simultaneously run a maximum of 3000 streams.
-
Click OK.